Lewati ke konten

Alamat Kantor

1301, Gedung B, Smart Valley, Country Garden, No. 50, Jalan Tiezai, Jalan Xixiang, Distrik Bao'an, Shenzhen, CN

Nomor Telepon

+8613686469587

Alamat Email

[email protected]

TV Box dan Set-Top Box

Hi3751 Android Display untuk Hunian Kampus: Keputusan Pembeli

Hi3751 Android Display untuk Hunian Kampus: Keputusan Pembeli

Panduan pengadaan Hi3751 android display untuk hunian kampus: bandingkan signage, set-top box, bukti, peran deployment, dan persyaratan RFQ.

Jawaban pengadaan dalam satu layar

Jika kebutuhan asymptotically-universityUnits housing adalah panel signage tetap berukuran 43 inci, pilih display yang lembar data produksi mengidentifikasi konfigurasi Hi3751. Jika电视 di ruang resident membutuhkan video yang dikendalikan operator, pilih Android TV box, bukan menganggap sign dan set-top box sebagai satu produk. Sebagian besar operator housing berada di sisi operator, sedangkan tim properti dan AV sering berada di sisi integrator. Operator membutuhkan playback terkelola, entitlement, dan kontrol jaringan; lokasi membutuhkan panel tahan lama, input yang jelas, dan proses servis yang sederhana.

Jawaban singkatnya adalah menentukan peran deployment sebelum menyebut chipset. Jalur display tetap mengarah ke DS43H, sedangkan jalur television operator mengarah ke DM21P atau DM21S. Jika konfigurasi perangkat lunak Android non-Google-TV yang bersertifikasi Google diwajibkan, nilai DM21RTD secara terpisah.

Keputusan android display ini karena itu berkaitan dengan batas sistem: panel, playback box, konektivitas, manajemen, dan bukti. Konfirmasikan lembar data produksi, SKU yang tepat, ruang yang ditUJUkan, dan lokasi pemasangan sebelum menyetujui purchase order. Untuk pertanyaan yang lebih luas tentang pemilihan chipset, lihat pertanyaan pembeli tentang Hi3751. Minta audit factory video atau bukti SMT/AOI dan aging khusus SKU melalui kualitas factory DataMax sebelum persetujuan final.

Realitas deploymentPersyaratan utamaArah pengadaan
Display informasi 43 inci untuk pemasangan di dindingPanel 1920x1080, 300 cd/sqm, input yang ditentukanNilai DS43H
Layanan television terkelola untuk ruang residentOperasi set-top 4K dan integrasi middlewareNilai DM21P atau DM21S
Perangkat lunak AOSP bersertifikasi Google yang diwajibkanKonfigurasi AOSP bersertifikasi GMSNilai DM21RTD

RFQ yang lengkap harus mengidentifikasi apakah android displaycatenai diberi daya secara lokal, menerima konten dari box lain, atau beroperasi sebagai endpoint signage mandiri. RFQ juga harus menyatakan siapa yang memiliki tanggung jawab atas pembaruan perangkat lunak, pemulihan konten, provisioning jaringan, dan perawatan fisik. Baris chipset tanpa kolom-kolom tersebut mungkin lulus perbandingan laboratorium, tetapi tetap gagal dalam commissioning.

Failure mode yang mencapai lapangan

Failure lapangan pertama adalah kesalahan kategori: pembeli menentukan SoC dan kemampuan display sebagai satu persyaratan terbundel, kemudian menerima panel tanpa perangkat lunak playback atau set-top box tanpa panel. Unit signage berbasis Hi3751 dapat memenuhi instalasi dengan format tetap, tetapi tidak otomatis menyediakan middleware operator, manajemen perangkat ruang, layanan television hunian, atau alur kerja IPTV yang lengkap. Setiap penawaran yang memperlakukan fungsi tersebut dapat dipertukarkan perlu diuraikan.

Failure kedua adalah configuration drift. Fakta DS43H mengidentifikasi Hisilicon Hi3751 quad 32-bit A53 dan AOSP Android 9. Referensi Android version, daya, memori, dan kecerahan yang saling bertentangan tidak boleh diselesaikan secara diam-diam dalam RFQ. Tetapkan konfigurasi produksi dalam purchase order dan wymajibkan bukti pengiriman agar sesuai. Lembar data produksi tetap menjadi acuan utama untuk keputusan ini.

Jebakan lapangan

Judul yang menyebut Android 11 tidak dapat menggantikan lembar data yang menyebut Android 9. Tetapkan OS, memori, input daya, kecerahan panel, dan opsi konektivitas secara tepat seperti tertulis pada SKU dalam purchase order. Konfirmasikan terhadap lembar data produksi, bukan dengan menggabungkan kolom katalog dan PDP.

Failure ketiga adalah mengasumsikan bahwa android display dapat mendekode media yang sama seperti TV box yang lebih baru. DS43H ditentukan untuk 1080P@60 dan VP9 10-bit, tanpa dukungan 4K atau AV1. DM21P mendukung AV1 [email protected], VP9/H.265 4K@60, dan H.264 4K@30. DM21S mendukung AV1/H.265 [email protected] 4K@60. Sign yang menampilkan dashboard layanan properti dan television yang membawa video operator merupakan beban kerja yang berbeda; gunakan persyaratan codec dan resolusi sebagai kriteria penerimaan.

Konektivitas juga dapat berbeda. DS43H menentukan input HDMI, input LVDS, empat port USB 2.0, dan RJ45 100M dengan opsi 1G. DM21P menentukan output HDMI 2.0b, dua port USB 2.0, TF, S/PDIF, AV 3.5mm, RJ45 100M, Wi-Fi6 2x2, dan Bluetooth 5.4. Penawaran distributor yang menganggap “HDMI” atau “Ethernet” sebagai detail yang cukup menyembunyikan arah, generasi, jumlah channel, dan status opsi.

Jebakan lapangan

Jangan biarkan singkatan dalam penawaran menghapus batas penerimaan. “HDMI” tidak membedakan input DS43H dari output DM21P; “100M” tidak berarti “1G”; dan “opsional” bukan konfigurasi yang telah dikomit. Tuliskan arah port dan setiap opsi yang dipilih dalam baris SKU.

Failure keempat adalah penerimaan media yang tidak lengkap. Laboratorium dapat mengonfirmasi bahwa stream AV1, VP9, atau H.265 dapat didekode pada model tertentu, sedangkan kegagalan lapangan terjadi karena paket konten menggunakan profile, resolusi, frame rate, atau output mode yang belum diuji dalam deployment. Untuk DS43H, uji konten 1080P@60 dan VP9 10-bit pada jalur panel yang ditUJUkan. Untuk DM21P dan DM21S, uji profile 4K@60 persis seperti tercantum untuk SKU yang dikomit. Catat format sumber, hasil dekoder, resolusi tampilan, frame rate, dan apakah audio diteruskan melalui output yang dipilih.

Failure kelima adalah ketidaksesuaian termal, daya, atau enclosure. DS43H menentukan suhu operasi 0-50C dan DC12V/2A, dengan opsi daya tunduk pada konfirmasi lembar data produksi. Instalasi housing yang menempatkan display di balik kaca, di dalam relung tertutup, atau di samping sumber panas dapat mengubah perilaku termal. Wajibkan integrator untuk mendokumentasikan ventilasi, orientasi pemasangan, routing kabel, dan susunan daya yang dipilih sebelum persetujuan pengiriman.

Failure keenam adalah menerima box tanpa kontrak jaringan. “RJ45 100M” mungkin memadai untuk LAN terkontrol, tetapi tidak menjawab apakah jaringan housing menggunakan VLAN, DHCP, captive portal, multicast, atau metode autentikasi tertentu. Minta operator untuk mengidentifikasi rencana alamat, proses provisioning, sumber konten, jalur pembaruan, dan tanggung jawab monitoring. Set-top box yang lulus uji playback di bench tetap dapat gagal jika tidak dapat memperoleh konfigurasi setelah reboot.

Failure ketujuh adalah mengizinkan persyaratan android display untuk menghilangkan perilaku pemulihan. Jika sign kehilangan akses jaringan, apakah sign mempertahankan playlist valid terakhir? Jika television box kehilangan entitlement, apakah device kembali ke status offline atau menampilkan error? Jika device melakukan reboot saat pembaruan, siapa yang memulihkan image yang telah disetujui? Persyaratan operasional ini harus dicantumkan dalam spesifikasi pembelian, skrip pengujian factory, dan prosedur penerimaan di lokasi, bukan dalam deskripsi produk umum.

Jejak bukti dari SMT hingga pengiriman

Titik kontrol factory adalah rangkaian catatan, bukan satu sertifikat pass/fail. Untuk pesanan DS43H tetap, jejak bukti harus menghubungkan SKU produksi dengan perakitan board, integrasi panel, firmware, output tampilan, dan konfigurasi pengiriman. Untuk pesanan DM21P atau DM21S, jejak bukti harus menghubungkan SKU box yang dipilih dengan pemasangan SoC, konfigurasi storage, image sistem operasi, kewajiban middleware/DRM, opsi konektivitas, dan pengujian akhir.

  1. Kunci SKU Catat model, OS, memori, persyaratan display atau dekode, arah port, daya input, konfigurasi panel, serta sertifikasi yang diperlukan. Perlakukan konflik yang belum diselesaikan sebagai pertanyaan rekayasa, bukan asumsi.
  2. Telusuri SMT dan inspeksi Minta instruksi kerja SMT yang berlaku, hasil AOI, catatan konfigurasi, dan keterlacakan komponen untuk lot produksi. Bukti harus mengidentifikasi SKU yang telah dikunci, bukan hanya keluarga board.
  3. Verifikasi perangkat lunak dan media Catat image OS yang terpasang, build identifier, kumpulan uji codec, daftar periksa DRM atau middleware jika berlaku, serta equipment display atau output yang digunakan untuk pengujian.
  4. Selesaikan burn-in dan aging Dapatkan prosedur aging yang disepakati dan hasilnya untuk konfigurasi yang dipesan, termasuk runtime, gangguan yang teramati, serta tindak lanjut tindakan korektif.
  5. Audit konfigurasi akhir Bandingkan packing list, label, firmware, opsi, dan laporan uji dengan SKU pada purchase order. Selesaikan setiap penggantian sebelum rilis.

Aturan bukti: laporan uji hanya berguna apabila model, konfigurasi, standar, tanggal, dan sampel uji dapat dihubungkan dengan pengiriman. Laporan umum tanpa keterlacakan konfigurasi tidak dapat membuktikan kesesuaian untuk SKU yang dibeli.

Foto di bawah ini merupakan ilustrasi produksi, bukan bukti adanya board atau lot DataMax tertentu.

Hi3751 android display for campus housing

Untuk pembelian android display, hierarki bukti sangat penting. Pernyataan supplier merupakan titik awal yang paling lemah. Laporan umum mungkin menunjukkan kompetensi proses, tetapi tidak kesesuaian produk. Laporan khusus standar dapat menghubungkan metode pengujian dengan konfigurasi produk. Sertifikat yang memiliki fitur pencarian dalam registri publik menawarkan jalur verifikasi terkuat, dengan tetap mempertimbangkan cakupan, keterhubungan model, masa berlaku, dan pemeriksaan penerbit.

Kekuatan relatif bukti kesesuaian yang dapat diterima pembeli

Klaim supplier15/100
Laporan uji umum42/100
Laporan khusus standar70/100
Sertifikat dengan fitur pencarian dalam registri publik94/100

Ini adalah skala perencanaan kualitatif dari penyuntingan, bukan data terukur atau teraudit; skala ini hanya 用于 peringkat jenis bukti dalam perencanaan pengadaan.

Titik kendali berikutnya adalah rekonsiliasi konfigurasi. Bandingkan BOM yang disetujui, image identifier Android, opsi panel, opsi port, label, dan catatan uji akhir. Untuk DS43H, pemeriksa secara khusus harus memastikan bahwa konfigurasi yang diterima cocok dengan kolom Hi3751, AOSP Android 9, memori, panel, input, dan daya yang dinyatakan. Untuk set-top box, pemeriksa harus memastikan bahwa RAM/ROM, kemampuan codec, opsi DRM, kecepatan Ethernet, dan opsi nirkabel tidak disimpulkan dari brosur keluarga produk.

Catatan inspeksi akhir yang baik menutup lingkaran dari produk hingga pengiriman. Catat ini mengidentifikasi unit yang diuji atau lot sampel, mencatat identifier nomor seri dan konfigurasi, mengacu pada prosedur uji, mencantumkan hasil lulus/gagal, serta mengidentifikasi setiap penyimpangan dan tindakan korektif. Tanpa hubungan tersebut, suatu laporan secara teknis dapat sah untuk model lain, tetapi tidak dapat digunakan untuk konfigurasi android display yang dibeli.

Opsi yang dibandingkan berdampingan

Perbandingan pertama adalah antara peran produk, bukan tingkat harga. DS43H mengintegrasikan panel TFT LED 43 inci dengan hardware Android berbasis Hi3751. DM21P merupakan set-top box IPTV 4K dan operator-middleware. DM21S merupakan Android TV box 4K untuk penggunaan white-label IPTV/OTT. DM21RTD ditujukan bagi operator dan retailer yang memerlukan konfigurasi non-Google-TV bersertifikat Google menggunakan AOSP bersertifikat GMS.

ModelHardware dan OSPosisi mediaBatas kecocokan terbaik
DS43HHi3751 quad 32-bit A53; AOSP Android 91080P@60; VP9 10-bit; tanpa 4K/AV1Signage dinding_fixed untuk hospitality, rumah sakit, dan restoran
DM21PAmlogic S905Y4, quad Cortex-A35; AOSP Android 11AV1 [email protected]; VP9/H.265 4K@60; H.264 4K@30Set-top box IPTV 4K dan operator middleware
DM21SAmlogic S905Y5, quad Cortex-A55; AOSP Android 14AV1/H.265 [email protected] 4K@60Android TV box white-label IPTV/OTT 4K
DM21RTDRealtek RTD1325; AOSP bersertifikat GMSKemampuan AV1SKU non-Google-TV bersertifikat Google

Untuk layar properti area umum, jalur DS43H menawarkan panel terintegrasi dan titik operasi 1080p. Untuk distribusi televisi di dalam kamar, DM21P menyediakan kecocokan operator yang ditentukan serta daftar dekode eksplisit yang lebih luas. DM21S merupakan arah yang lebih jelas ketika Android TV box white-label 4K dan AOSP Android 14 sesuai dengan proyek. DM21RTD berlaku ketika persyaratan sertifikasi itu sendiri menentukan keputusan platform.

Opsi ini tidak dapat dipertukarkan secara langsung. Kecerahan, sudut pandang, dan dimensi panel penting bagi lokasi; sedangkan middleware, profil dekoder, DRM, dan antarmuka output box penting bagi operator. Skor procurements harus menandai setiap komponen sebagai wajib, opsional, atau di luar cakupan. Skor tidak diberikan untuk kemampuan yang tidak digunakan dalam deployment.

Bangun perbandingan berdasarkan tiga kolom RFQ: integrasi display tetap, pengiriman televisi operator, dan pemilihan yang didorong oleh sertifikasi. Hal ini mencegah persyaratan **android display** berubah menjadi perbandingan yang hanya berfokus pada chipset.

Tinjauan berdampingan yang praktis harus menguji empat kondisi batas. Pertama, tanyakan apakah produk terpasang secara fisik pada display atau berada di samping televisi penghuni. Kedua, pastikan apakah sumber konten berupa signage lokal, playlist jaringan, atau layanan entitlement operator. Ketiga, tetapkan apakah output berupa input panel atau output HDMI yang mengarah ke televisi. Keempat, identifikasi siapa yang bertanggung jawab atas pemulihan setelah pembaruan gagal. Produk yang lulus tiga pemeriksaan pertama tetap dapat gagal secara operasional jika pemeriksaan keempat tidak memiliki pemilik yang jelas.

Perbandingan juga membutuhkan disiplin “tidak dinyatakan”. Fakta yang tersedia untuk DM21RTD mengidentifikasi SoC, sistem operasi, dan kemampuan AV1, tetapi tidak menyediakan RAM/ROM atau port. Kolom tersebut harus tetap kosong dalam RFQ hingga datasheet produksi menyediakannya. Aturan yang sama berlaku untuk kecepatan Ethernet opsional, DRM opsional, dan varian penyimpanan. Opsi yang belum dikunci tidak dapat disajikan sebagai fitur penerimaan, dan alternatif katalog tidak dapat diam-diam menggantikan SKU produksi.

Untuk perumahan kampus, gunakan matriks untuk memisahkan persyaratan wajib dari yang berguna. Jika sebuah gedung memiliki tanda di lobi dan layanan televisi di dalam kamar, arah penggunaan DS43H serta DM21P atau DM21S dapat hidup berdampingan sebagai baris terpisah. Jika operator menyediakan lingkungan aplikasi bersertifikat untuk setiap kamar, DM21RTD mungkin relevan. Jika lokasi hanya memerlukan layar informasi properti tetap, menambahkan persyaratan dekoder 4K pada DS43H tidak akan meningkatkanimplementation dan justru dapat menciptakan kriteria penerimaan yang mustahil dipenuhi.

Contoh pengadaan ini menunjukkan mengapa pemisahan peran mencegah pemborosan. Layar lobi 43 inci dapat menggunakan DS43H untuk informasi properti, sedangkan DM21P terpisah melayani kanal operator pada televisi area umum. Gedung yang sama juga dapat menggunakan DM21S untuk layanan OTT white-label. Setiap baris kemudian memiliki sumber konten, pemilik pembaruan, jalur sinyal, dan catatan penerimaan tersendiri. regards Ketiga produk tersebut sebagai varian dari satu android display menciptakan kustomisasi yang dapat dihindari dan mengaburkan tanggung jawab lapangan.

Asal istilah

“AOSP,” “Android TV,” “GMS,” “DRM,” dan “4K” menggambarkan lapisan yang berbeda. AOSP adalah baseline perangkat lunak Android Open Source Project. AOSP Android 9, AOSP Android 11, dan AOSP Android 14 identifying generasi sistem operasi dalam fakta produk. Konfigurasi AOSP bersertifikat GMS menambahkan sertifikasi Google Mobile Services; konfigurasi tersebut tidak menjadikan produk sebagai Google TV. Kecocokan DM21RTD secara eksplisit merupakan SKU non-Google-TV yang bersertifikat Google.

“DRM” mengidentifikasi mekanisme lisensi, bukan layar. DM21P mencantumkan Widevine L1, PlayReady, serta HDCP 2.2 opsional. DM21S mencantumkan Widevine L1 dan PlayReady sebagai opsional, serta Dolby Vision dan DTS. Entri ini menggambarkan kemampuan platform atau opsi; bukan membuktikan bahwa kontrak layanan operator kampus akan Menyediakan setiap lisensi untuk akun atau wilayah tertentu.

“AV1,” “VP9,” dan “H.265” adalah kemampuan codec dengan konsekuensi deployment yang berbeda. AV1 dapat mengurangi tekanan distribusi, tetapi rantai lengkap tetap memerlukan persiapan media yang sesuai, kinerja dekode, kemampuan keluaran, dan playback yang kompatibel. Kemampuan dekode yang dinyatakan berlaku pada set-top box, bukan secara otomatis pada panel tetap atau televisi yang dikendalikannya.

Profil media dan kebijakan DRM
→
Build OS dan middleware
→
Set-top box
→
Transport HDMI atau jaringan
→
Televisi atau panel

“Android TV box,” “digital-signage player,” dan “operator middleware set-top box” juga menggambarkan batas sistem yang berbeda. Box yang terhubung ke televisi kamar penghuni biasanya merupakan perangkat akses. Layar tetap dapat menjadi endpoint untuk digital-signage player. Layanan IPTV terkelola menambahkan proses provisioning, entitlement, telemetry, pembaruan, dan dukungan yang tidak dapat diselesaikan oleh designations chipset apa pun.

Untuk proyek perumahan, tulis jalur data secara eksplisit: asal konten, penerapan hak, perangkat playback, jalur jaringan, antarmuka keluaran, dan endpoint layar. Satu baris ini mencegah android display dispesifikasikan seolah-olah aplikasi, konektivitas, dan panel merupakan satu objek teknis yang sama.

Nama chipset termasuk dalam lapisan perangkat keras. Nama tersebut tidak menentukan sistem operasi, sertifikasi Google, dukungan konten berlisensi, middleware, atau provisioning kamar. Baris sistem operasi menentukan baseline perangkat lunak, tetapi tidak membuktikan bahwa image middleware operator telah terintegrasi. Baris DRM menentukan kemungkinan mekanisme proteksi, tetapi tidak menetapkan server lisensi, entitlement akun, perpanjangan token, atau kebijakan regional. Baris panel menentukan endpoint, tetapi tidak menentukan player yang给它suplai.

“Area umum” dan “kamar penghuni” merupakan perbedaan operasional selain fisik. Layar area umum dapat menjalankan jadwal tetap dengan pemulihan lokal, sedangkan perangkat kamar penghuni mungkin memerlukan provisioning jarak jauh, penanganan kedaluwarsa entitlement, ketahanan terhadap reboot, dan pelaporan layanan. “Input” dan “output” harus tetap bersifatirectional. DS43H memiliki input HDMI dan LVDS; DM21P serta DM21S memiliki output HDMI 2.0b. Tim pengadaan yang membalik istilah tersebut dapat menyetujui perangkat yang tidak dapat ditempatkan dalam rantai sinyal yang dimaksud.

Deskripsi 43 inci juga tidak menciptakan kategori panel universal. DS43H merupakan produk terintegrasi spesifik dengan panel TFT LED 1920x1080, kecerahan 300 cd/sqm, kontras 1500:1, respons 6ms, sudut pandang 89deg, spesifikasi backlight 50.000h, serta dimensi 989x578.5x60.3mm. Fakta tersebut mendukung kecocokannya sebagai layar tetap; fakta tersebut tidak menentukan layar yang belum dispesifikasikan yang hanya menggunakan chipset yang sama. Konfirmasikan terhadap lembar data produksi untuk setiap konfigurasi terkait.

Penamaan Hi3751 juga menentukan keluarga processor, bukan produk layar secara keseluruhan. Bahasa pengadaan harus membedakan processor, board, image perangkat lunak, panel, enclosure, dan sistem yang terpasang. Jika persyaratan menyebut processor tetapi tidak menentukan panel, sistem operasi, jalur input, dan daya, maka android display tetap kurang dispesifikasikan meskipun SoC-nya benar. Setiap lapisan memerlukan pemilik dan bidang penerimaan yang dapat diverifikasi.

Perbandingan lima SKU produksi

Hanya empat model produksi yang tercantum dalam fakta produk yang disediakan. Jadi, SKU kelima tidak dibuat di sini. Baris kelima merupakan konfigurasi RFQ terkonsolidasi untuk jalur Hi3751 android display, yangaea dengan DSS43H berdasarkan data produksi DS43H. Setiap alternatif yang diminta tetap memerlukan konfirmasi terhadap lembar data produksi dan SKU purchase order.

Model atau barisSoC / GPUOSMemoriLayar atau dekodeKonektivitas dan fakta fisik
DM21PAmlogic S905Y4, quad Cortex-A35AOSP Android 112GB / 8GB; 4GB; 16/32/64GB opsionalAV1 [email protected]; VP9/H.265 4K@60; H.264 4K@30HDMI 2.0b out x1; USB2.0 x2; TF; S/PDIF; AV 3.5mm; RJ45 100M; Wi-Fi6 2x2 + BT5.4; DC 5V/2A
DM21RTDRealtek RTD1325AOSP bersertifikat GMSKonfirmasikan terhadap lembar data produksiKemampuan AV1Konfirmasikan port, memori, dan detail fisik terhadap lembar data produksi
DS43HHisilicon Hi3751 quad 32-bit A53; Mali-450AOSP Android 91GB / 8GBTFT LED 43 inci; 1920x1080; 300 cd/sqm; 1500:1; 6ms; 89deg; backlight 50,000h; 1080P@60 + VP9 10-bit; tanpa 4K/AV1HDMI in; LVDS in; USB2.0 x4; RJ45 100M, 1G opt; DC12V/2A; 989x578.5x60.3mm; 0-50C
DM21SAmlogic S905Y5, quad Cortex-A55AOSP Android 142GB / 16GB; 2/4/8GB; 16/32/64GB opsionalAV1 / H.265 [email protected] 4K@60HDMI 2.0b out; S/PDIF; AV; USB2.0 x2; TF; RJ45 100M, 1G opsional; Wi-Fi6 2x2 + BT5.4
Baris konfigurasi Hi3751Hisilicon Hi3751 quad 32-bit A53; Mali-450AOSP Android 91GB / 8GBTFT LED 43 inci; 1920x1080; 300 cd/sqm; tanpa 4K/AV1HDMI in; LVDS in; USB2.0 x4; RJ45 100M, 1G opt; DC12V/2A; 989x578.5x60.3mm; 0-50C

Perbandingan ini sengaja mengandung informasi yang dihilangkan. Pilihan daya DS43H harus dikonfirmasi terhadap lembar data produksi, bukan disimpulkan dari deskripsi daya alternatif. RAM/ROM, kecerahan, dan SoC-nya tetap menggunakan nilai PDP produksi; varian katalog tidak boleh menggantikannya. DM21RTD memiliki rangkaian fakta yang diberikan lebih terbatas, sehingga RAM/ROM dan portnya tetap tidak dinyatakan.

Kekuatan bukti kesesuaian yang dapat diserahkan kepada pembeli (penilaian editorial)
Kekuatan bukti kesesuaian yang dapat diserahkan kepada pembeli (penilaian editorial)Sumber: Tim editorial DataMax, skala perencanaan kualitatif (0-100), bukan data yang diaudit atau diukur

Angka yang sama dalam bentuk yang dapat dicari:

Pilihan buktiSkor editorial
Klaim pemasok15/100
Laporan pengujian generik42/100
Laporan khusus standar70/100
Sertifikat dengan penelusuran daftar publik94/100

Sumber: Tim editorial DataMax, skala perencanaan kualitatif, bukan data yang diaudit atau diukur. Skor peringkatkan jenis bukti; hal tersebut tidak_differencecertifies model apa pun.

Tabel lima baris ini adalah catatan konfigurasi, bukan rekomendasi untuk memesan lima produk. Baris kelima menggabungkan fakta DS43H yang diberikan karena tidak ada model produksi kelima yang dinyatakan. Tujuannya adalah mengubah pembahasan tentang layar tetap menjadi baris SKU yang dapat disalin. Setiap nilai alternatif untuk SoC, sistem operasi, konfigurasi memori, atau kecerahan harus dikonfirmasi terhadap lembar data produksi dan ditetapkan dalam pesanan pembelian.

Tabel ini juga menunjukkan mengapa kekuatan bukti dan kemampuan produk harus dinilai secara terpisah. DM21P memiliki daftar dekode yang terperinci dan definisi port, tetapi fakta tersebut tidak membuktikan integrasi middleware khusus operator. DM21RTD memiliki kesesuaian yang berorientasi pada sertifikasi, tetapi fakta yang diberikan tidak mengidentifikasi memori atau portnya. DS43H memiliki fakta terperinci tentang panel, input, fisik, dan lingkungan, tetapi kemampuan media sengaja diarahkan pada 1080p. Karena itu, RFQ lengkap harus menggabungkan konfigurasi model dengan bukti pengujian dan sertifikat yang berlaku.

Untuk disiplin tinjauan, tandai setiap sel dalam tabel sebagai diberikan, opsional, tidak ada, atau memerlukan konfirmasi. Ethernet 1G pada DS43H bersifat opsional, HDCP 2.2 pada DM21P bersifat opsional, dan Ethernet 1G pada DM21S bersifat opsional. Ketiganya bukan jenis “opsional” yang dapat dipertukarkan: satu merupakan pilihan jaringan, satu merupakan pilihan perlindungan konten, dan satu mengubah jalur data. Pesanan pembelian harus mengidentifikasi pilihan mana yang disepakati untuk setiap baris android display.

Operator, integrator, dan lokasi

Operator, integrator, dan lokasi memiliki konsekuensi kegagalan yang berbeda. Operator mengendalikan layanan, hak akses, middleware, dan kesinambungan tontonan. Integrator bertanggung jawab atas pemasangan, pengkabelan, perilaku layar, dan serah terima lokasi. Lokasi bertanggung jawab atas ruang fisik, kondisi lingkungan, dampak terhadap penghuni, dan akses layanan. Satu android display mungkin memerlukan uji penerimaan dari ketiganya, tetapi setiap uji memiliki pemilik yang berbeda.

SituasiKebutuhan utamaArah modelBukti penerimaan
Operator meluncurkan layanan IPTV terkelolaIntegrasi middleware, profil dekoder, DRM, dan jalur outputDM21P untuk kesesuaian operator yang dinyatakan; DM21S untuk jalur TV-box 4K white-labelDaftar periksa middleware, uji dekode, catatan gambar yang telah dikonfigurasi
Saluran ritel atau white-label memerlukan AOSP bersertifikat GMSEkosistem aplikasi bersertifikat dan bukti khusus SKUDM21RTDCakupan sertifikat dan penelusuran daftar publik jika tersedia
Integrator memasang layar informasi tetap 43 inciResolusi panel, input, dimensi fisik, operasi berkelanjutanDS43HUji output panel, uji input, audit dimensi dan opsi
Lokasi mengoperasikan lift, lobby, dan fasilitas bersamaPanel yang mudah dibaca, pemutaran terkendali, pemulihan sederhanaDS43H untuk titik akhir tetapGambar hasil pemasangan di lokasi, log jadwal, prosedur layanan
Kamar penghuni menerima televisi operatorKemampuan 4K jika diwajibkan, konektivitas LAN, kontrol middlewareDM21P atau DM21S sesuai jalur perangkat lunak dan sertifikasiKonfigurasi tingkat kamar, pemutaran aliran, uji mulai ulang dan pembaruan

Bagi operator, DS43H tetap relevan di area bersama meskipun layanan televisi menggunakan perangkat terpisah. Ini merupakan arsitektur dua perangkat, bukan konflik chipset. Layar tanda menangani informasi properti, sedangkankotak menangani video operator. RFQ harus mengidentifikasi apakah pemutaran bersifat lokal, networked, atau dipindahkan dari sumber lain.

Bagi integrator, “Android” tidak menggantikan dokumentasi jalur sinyal. Nyatakan input HDMI untuk DS43H jika sesuai, output HDMI 2.0b untuk DM21P dan DM21S, kecepatan RJ45, kebutuhan daya, serta tanggung jawab kabel. Dimensi fisik DS43H adalah 989x578.5x60.3mm dan rentang operasi yang ditentukan adalah 0-50C. Dimension tersebut merupakan batasan pemasangan, bukan dimensi pemasaran.

Bagi lokasi, kemudahan layanan dan gangguan terhadap penghuni penting. Dokumentasikan perilaku mulai ulang, penggantian gambar, pemulihan akun, akses fisik, dan jalur konten cadangan. Tanyakan siapa yang bertanggung jawab atas kegagalan pembaruan dan apakah penggantian perangkat dapat dilakukan tanpa harus membangun ulang asosiasi layanan kamar penghuni.

Lakukan tinjauan penerimaan tiga pihak sebelum persetujuan pengiriman. Operator memvalidasi fungsi layanan, integrator memvalidasi persyaratan fisik dan jalur sinyal, serta lokasi memvalidasi hasil pemasangan. Satu tanda tangan tidak menggantikan dua tanda tangan lainnya.

Uji penerimaan operator harus mencakup status layanan, bukan hanya gambar. Untuk perangkat kamar terkelola, verifikasi akun yang ditetapkan, hak akses, akses saluran atau aplikasi, perilaku mulai ulang, perilaku pembaruan, dan jalur cadangan saat jaringan tidak tersedia. Untuk DM21P, hubungkan uji dengan profil dekode 4K yang dinyatakan; untuk DM21S, hubungkan dengan profil AV1 dan H.265 4K@60 yang dinyatakan. Jika AOSP bersertifikat GMS merupakan jalur penentu, mintalah cakupan sertifikat dan keterkaitan model, bukan menerima kata “bersertifikat” secara terpisah.

Uji penerimaan integrator harus bersifat fisik dan spesifik terhadap jalur sinyal. Konfirmasikan konfigurasi panel DS43H yang dipilih, jalur inputnya, ruang bebas selubung, orientasi pemasangan, dan lingkungan operasi. Konfirmasikan antarmuka output kotak dan opsi Ethernet terhadap televisi kamar penghuni serta jaringan dinding yang sebenarnya. Jika proyek mencampur DS43H dan kotak keluarga DM21, pertahankan label terpisah untuk pemutar tanda, perangkat akses televisi, kabel, catu daya, dan sambungan jaringan.

Uji penerimaan lokasi harus mencakup pengalaman penghuni dan kontrak layanan. Layar lobby harus menampilkan templat darurat, fasilitas, dan informasi properti yang telah disetujui. Perangkat kamar penghuni harus memulihkan layanan setelah siklus daya, dan unit pengganti harus mewarisi konfigurasi yang benar melalui proses operator. Reset medan secara manual oleh staf lokasi mungkin sesuai untuk tanda, tetapi tidak memadai untuk layanan televisi yang dikendalikan hak akses; tetapkan metode pemulihan secara eksplisit.

Dokumen pengadaan juga harus menentukan apa yang terjadi ketika suatu model tidak tersedia atau ketika opsi katalog diminta. Untuk DS43H, konflik yang diketahui melibatkan sistem operasi, deskripsi daya, memori, kecerahan, dan SoC. Permintaan alternatif bukan bukti bahwa alternatif tersebut tersedia dalam lembar data produksi. Mewajibkan pemasok untuk mengembalikan baris konfigurasi yang diusulkan, menyatakan apakah setiap field merupakan komitmen atau opsi, serta mengidentifikasi bukti produksi yang akan menyertai SKU tersebut secara persis.

Contoh penerapan praktis memisahkan tanggung jawab. Signage di lobby menggunakan DS43H dengan playlist persetujuan yang disimpan secara lokal dan prosedur pemulihan yang dikelola lokasi. Kamar penghuni menggunakan DM21P dengan middleware operator, provisioning jaringan, pemeriksaan entitlement, dan pemantauan terpusat. Jika operator kemudian_information_information_information

Cara memilih, langkah demi langkah

Mulai dengan batas display. Jika proyek memerlukan panel tetap 43 inci, gunakan DS43H dan konfirmasikan konfigurasi produksi persisnya. Jika television penghuni memerlukan perangkat yang dikelola operator, gunakan DM21P atau DM21S. Jika Google-certified non-Google-TV AOSP bersifat wajib, sertakan DM21RTD dalam evaluasi.

  1. Tentukan endpoint Tulis “panel tetap 43 inci” atau “perangkat akses television”. Jangan gunakan **android display** sebagai satu-satunya deskripsi produk.
  2. Kunci jalur sistem operasi Nyatakan AOSP Android 9 untuk jalur DS43H, AOSP Android 11 untuk DM21P, AOSP Android 14 untuk DM21S, atau AOSP bersertifikat GMS untuk DM21RTD, dengan syarat konfirmasi berdasarkan lembar data produksi.
  3. Tentukan persyaratan media Definisikan resolusi, frame rate, profil codec, HDR jika dikontrakkan, dan DRM. Persyaratan signage 1080P@60 tidak dapat dipertukarkan dengan pengiriman television 4K@60.
  4. Bekukan perangkat keras dan port Nyatakan SoC, memori, arah input/output, kecepatan Ethernet, opsi nirkabel, daya, dimensi, serta setiap batasan suhu secara langsung dalam baris SKU.
  5. Tentukan kontrak operasional Spesifikasikan provisioning, middleware, kepemilikan pembaruan, proses pemulihan, pemantauan, dan bukti yang diperlukan saat penerimaan pabrik dan commissioning lokasi.
  6. Wajibkan bukti yang dapat ditelusuri Minta catatan SMT/AOI, penuaan, software/konfigurasi, dan inspeksi akhir yang ditautkan ke SKU yang dikomitmenkan. Selesaikan setiap ketidaksesuaian sebelum pengiriman.
Definisi endpoint
→
OS dan chipset
→
Media dan DRM
→
Port dan daya
→
Bukti dan penerimaan

Baris RFQ yang siap disalin harus seperti ini: “Display tetap: DS43H, Hisilicon Hi3751 quad 32-bit A53, Mali-450, AOSP Android 9, 1GB/8GB, 43-inch TFT LED 1920x1080, 300 cd/sqm; input HDMI dan input LVDS; USB2.0 x4; RJ45 100M dengan opsi 1G; DC12V/2A; 989x578.5x60.3mm; opsi daya produksi dikonfirmasi berdasarkan lembar data produksi.”

Untuk perangkat television terkelola, tulis: “DM21P, Amlogic S905Y4, quad Cortex-A35, AOSP Android 11, 2GB/8GB, AV1 [email protected], VP9/H.265 4K@60, H.264 4K@30, output HDMI 2.0b x1, USB2.0 x2, TF, S/PDIF, AV 3,5mm, RJ45 100M, Wi-Fi6 2x2 + BT5.4, DC 5V/2A; sertakan checklist middleware dan DRM serta daftar sertifikat pasar target.”

Baris kedua untuk jalur television white-label dapat mengidentifikasi DM21S, AOSP Android 14, AV1/H.265 [email protected] 4K@60, output HDMI 2.0b, serta opsi memori dan Ethernet yang dipilih. Untuk DM21RTD, minta cakupan sertifikat, keterkaitan model, konfigurasi produksi yang tersisa, dan metode penerimaan AV1 tanpa menyimpulkan port atau memori yang tidak disebutkan.

Sebelum menerbitkan purchase order, mintalah audit pabrik video atau bukti SMT/AOI dan penuaan khusus SKU dari DataMax manufacturing. Untuk pesanan android display, kirim email ke [email protected] dengan daftar SKU final, lembar data produksi, daftar sertifikat pasar target, checklist middleware dan DRM, serta lampiran SMT/AOI, penuaan, dan pengujian akhir yang diminta.

Pengesahan akhir harus memuat tiga keputusan terpisah: konfigurasi perangkat keras yang dikomitmenkan, cakupan software dan sertifikasi yang dikomitmenkan, serta bukti penerimaan yang dipetakan ke setiap SKU. Tidak ada persetujuan yang boleh mencantumkan “opsional” di sebelah field wajib tanpa penanggung jawab dan tanggal konfirmasi. Urutan ini menjaga keputusan display Hi3751 terpisah dari keputusan operator-box, serta memberi operator, integrator, dan lokasi dasar konfigurasi yang sama.

Bacaan lebih lanjut

FAQ

Apakah Hi3751 cocok untuk area umum housing kampus?

Ya, jika persyaratannya adalah endpoint signage tetap 43 inci. DS43H menentukan Hisilicon Hi3751, AOSP Android 9, panel TFT LED 1920x1080, 300 cd/sqm, input HDMI, input LVDS, empat port USB 2.0, dan RJ45 100M dengan 1G opsional. Produk ini tidak menentukan dekode 4K atau AV1, sehingga tidak boleh dipilih untuk beban kerja television operator 4K.

Apakah television housing kampus sebaiknya menggunakan DS43H atau set-top box?

Gunakan DS43H untuk persyaratan display dinding tetap dan set-top box untuk layanan television yang dikendalikan operator. DM21P cocok untuk 4K IPTV dan middleware operator, sedangkan DM21S cocok untuk penggunaan 4K IPTV/OTT white-label. Keduanya dapat mendukung peran berbeda dalam satu proyek housing, tetapi persyaratan software, media, port, dan_Id_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management_management

DM21P mendukung AV1 [email protected], VP9/H.265 4K@60, dan H.264 4K@30. DM21S mendukung AV1/H.265 [email protected] 4K@60. DM21RTD tercantum mampu mendukung AV1, sedangkan detail resolusi dan profilnya tidak disediakan. DS43H).[

Bagaimana端口 opsional dan sertifikasi harus ditulis?

Tandai setiap item opsional sebagai committed atau excluded, lalu ulangi nilai yang dipilih pada SKU pesanan pembelian. Misalnya, nyatakan RJ45 100M dengan 1G opsional hanya jika 1G diperlukan dan telah dikonfirmasi; jika tidak, nyatakan kecepatan yang committed. Minta daftar sertifikat pasar target, keterkaitan model, dan detail registri. Fitur yang digambarkan sebagai mampu atau opsional tidak membuktikan bahwa fitur tersebut tersedia, berlisensi, atau diterima dalam konfigurasi yang dikirim.

DataMax Engineering Team

Ditulis oleh

DataMax Engineering Team

The DataMax Engineering Team writes from our Shenzhen hardware, RF and firmware labs next to our own SMT and assembly lines. Articles cover board-level design, RF tuning, certification pre-compliance and production validation for Android TV, Google TV and smart-display products.

Leave a comment

Your email address will not be published. Required fields are marked *

Lanjutkan membaca

Tetap Terupdate dengan Tren TV Box Terbaru

Berlangganan newsletter kami dan jadilah yang pertama mengetahui tentang produk baru, tips OEM/ODM, penawaran eksklusif, dan pembaruan pabrik.

Pengalaman Anda di situs ini akan ditingkatkan dengan mengizinkan cookie.
Chat with us on WhatsApp