What the answer hinges on
An RFQ lands with three plausible model names, an HDMI claim, a “Wi-Fi 6” line and a request for operator-ready hardware. The engineering answer is not to approve the most feature-dense row; it is to convert each connection and certification claim into a testable line in the android tv box checklist. For the DataMax CROSS range, the decisive variables are the application profile, Android release, codec ceiling, physical I/O, wired-network option, wireless configuration, DRM position and the evidence retained at pilot sign-off.
For a premium UHD or cloud-gaming deployment, the DataMax DM21T starts from AOSP Android 14 and an Amlogic S905X5 with quad Cortex-A510, 4GB / 64GB family options and a USB3.0 port. For operator middleware, the DataMax DM21P provides AOSP Android 11 and the highest stated wired-network baseline among the relevant operator-facing configurations. The DataMax DM21S and DataMax DM22Q occupy different decode and processor positions within the same procurement frame.
This page covers only the I/O and connectivity angle. The broader procurement sequence is covered by the RK3568 Android box checklist for procurement; do not substitute a platform name for a verified requirement. The production datasheet and approved sample remain the controlling references for every SKU.
The short answer is therefore: freeze the deployment profile first, map every physical endpoint second, confirm the exact production configuration third, and attach test evidence to the purchase order. A connector name is not acceptance criteria. A Wi-Fi generation is not a network acceptance result. An optional DRM or Ethernet configuration must be written into the order, not inferred from the family description.
The quotation should identify one controlled configuration at a time. If the RFQ asks for an Android 14 operator box, USB3.0, 4K output and a specific DRM build, the buyer needs a model whose production facts support those requirements and a supplier evidence package that demonstrates the combination. If those conditions cannot all be confirmed before the PO, the commercial team should treat the requirement as open rather than allowing a generic “TV box” response to become the baseline.
The operator, the integrator and the venue
Connectivity requirements emerge from who owns the service and who touches the hardware after delivery. An operator may prioritize deterministic Ethernet, middleware stability and access-control integration. An AV integrator may count HDMI, AV, optical and USB endpoints on every display scenario. A venue operator may care about Wi-Fi coverage, wall mounting, peripheral integration and remote recovery.
| Situation | Requirement to freeze | Model direction |
|---|---|---|
| Pay-TV or IPTV operator | Operator middleware, DRM position, Ethernet, remote-control acceptance and Android compatibility | Evaluate DM21P for the operator middleware profile; use DM21S only where its Android 14 baseline and stated feature set fit |
| OTT or cloud-gaming operator | 4K decode ceiling, latency-sensitive networking, USB3.0, HDMI output and licensed-service deployment | Evaluate DM21T for its USB3.0 and stated 4K decode configurations; validate the complete service path |
| AV integrator | HDMI output, analog AV, S/PDIF, USB count, TF and installation method | Map each display and peripheral to an exact DM21T, DM21P, DM21S or DM22Q port row |
| Corporate or hospitality venue | Wi-Fi topology, wired fallback, update policy, wall-box restrictions and serviceability | Select by confirmed port and OS requirements; do not infer enclosure features from the connectivity row |
| Private-label brand | White-label expectations, packaging, regional compliance and middleware release ownership | Compare DM21S or another approved platform with DataMax through the customization route |
A photograph of the sourcing desk is a useful reminder that the comparison sheet is the work product:

One common RFQ error is treating every “TV box” as a replaceable endpoint. The android tv box checklist must distinguish between a set-top box receiving operator-controlled traffic, a consumer-facing Android TV product, and a box connected to fixed audiovisual equipment. The first commonly needs stricter access to software release control; the second needs validated app and DRM behavior; the third depends heavily on signal-path completeness.
For each situation, attach a signed port map. List the physical connector, intended signal, direction, electrical or protocol requirement, cable or accessory, operating environment and acceptance test. “HDMI capable” is not enough. “HDMI 2.0b out x1, used for the declared 4K display mode, with no claimed HDMI input” is a reviewable statement. Likewise, Wi-Fi 6 needs to be treated as a radio-generation description rather than a throughput guarantee. The stated products use variants of Wi-Fi6, but antenna design, enclosure, regulatory configuration and deployment density still require validation against the production datasheet and certification file.
An operator’s acceptance sheet should include Ethernet link establishment, DHCP or static-address assignment, loss of uplink behavior, multicast or IPTV path where required, service restart and remote-management checks. The test result belongs to the selected configuration, not merely to the model family. A staged sample with the wrong Ethernet option can create a false pass that disappears in the operator network.
An integrator’s sheet should map one row to every room or display zone: TV model, display resolution and refresh requirement, audio destination, camera or control peripheral, USB role, network path and service-access method. If a venue uses a USB3.0 storage workflow, a USB2.0-only row cannot satisfy that requirement merely because the device has two USB connectors. The procurement language should identify role, connector and expected behavior.
A brand team also needs to separate consumer packaging from service integration. The product may carry Android 14, but the RFQ still has to state whether GMS, a certified application environment, operator middleware, update ownership, branding files or a specific rights stack is required. Those are commercial and certification choices that cannot be inferred from a port table. The broader RFQ checklist can support those release and compliance questions without replacing the I/O map.
How to choose, step by step
Selection should run as a controlled sequence from application to acceptance evidence. Each stage needs an owner and an artifact; otherwise a missing answer can be silently interpreted as compliance.
- Classify the use case Record whether the product serves pay-TV/IPTV, OTT, cloud gaming, white-label Android TV, signage, hospitality or a fixed AV installation. Capture the service operator, target country, expected installation count and software-release responsibility.
- Freeze the display and media ceiling State the actual output resolution, refresh rate, codec profile, HDR expectation and DRM requirement. Reject a marketing resolution that exceeds the datasheet ceiling. Do not convert a decode capability into a guaranteed end-to-end output path.
- Build the physical I/O schedule Assign every HDMI, USB, RJ45, TF, S/PDIF and AV endpoint to a function. Specify connector count and direction, including whether USB3.0 is mandatory, whether Ethernet is 100M or the optional 1G configuration, and whether an HDMI input is required.
- Separate radio from network policy Record the required Wi-Fi and Bluetooth generations, antenna variants, regulatory domains, DHCP or static-IP behavior, VPN or multicast requirements and acceptable wired fallback. Require the radio configuration tied to the ordered SKU.
- Attach the software and rights stack Specify the AOSP Android release, GMS position if required, Widevine or PlayReady expectation, HDCP policy, Dolby Vision or DTS need, middleware version and update mechanism. The CRM/DRM checklist belongs in the RFQ, not in a verbal note.
- Convert assumptions into tests Define sample quantity, display equipment, network profile, peripherals, burn-in duration, reboot-cycle target, serviceability checks and the evidence package required before pilot or production release.
These steps can be pasted directly into an RFQ:
operator or venue
OS, codec, I/O
evidence package
A useful sequence line reads: “We require an AOSP Android 14 platform with HDMI 2.0b output, no HDMI input, one USB2.0 and one USB3.0 port, RJ45 100M with 1G optional, TF, S/PDIF, AV, Wi-Fi6 and Bluetooth 5.4; specify the selected wired-network configuration in the order.” That line can be reconciled with the DM21T facts, but it does not authorize unstated SKU assumptions. Confirm each configuration against the production datasheet.
The RFQ should ask the supplier to complete the blanks rather than paraphrase them. For example: “Selected OS: ____; selected memory/storage: ____; selected Ethernet: ____; selected DRM: ____; selected radio domain/module: ____; HDMI input required: yes/no; USB3.0 required: yes/no; target-market compliance scope: ____.” This prevents a family-level response from being accepted as an orderable bill of materials.
A second traceability table should identify every required interface and the party that signs its acceptance. The operator may sign Ethernet, service middleware and DRM behavior; the integrator may sign display, audio and peripheral operation; the factory may sign lot conformance and production test limits; the brand may sign packaging and labeling. A single engineering approval does not replace commercial acceptance by the party that owns the deployment.
This android tv box checklist also needs a change-control rule. Any substitution of SoC, Android release, RAM/ROM family option, port count, Ethernet variant, radio module, DRM build or firmware branch creates a new review point. Silent “equivalent” substitutions are technically incompatible with a traceable bill of materials.
What goes wrong after the PO
Most post-PO failures are not dramatic hardware faults. They are unresolved interpretation differences: the buyer assumed an input, the supplier supplied an output; the operator needed a stable wired path, the quotation implied Wi-Fi alone; the integrator counted USB-A but not USB version; or the brand expected a DRM service that the ordered build did not contain.
Field trap
Do not accept “HDMI 2.0b” as a complete signal specification. The DM21T has HDMI 2.0b out and no HDMI input; the other listed models likewise specify HDMI output. If capture, converter, pass-through or matrix use requires HDMI input, the approved configuration must provide it. Writing that the port is “4K-ready” also leaves unresolved the display mode, HDCP path, HDR service and EDID behavior.
Field trap
Wi-Fi6 is not synonymous with acceptable service delivery. Antenna placement, enclosure, regulatory certification, channel plan, interference, DHCP leases and power draw all affect the result. For an operator’s managed network, state whether Ethernet is mandatory, whether 100M is acceptable, whether the optional 1G configuration is required and what happens when the access point is unavailable.
Quotation divergence usually appears in five places. First, model families contain optional memory, storage, Ethernet and rights configurations. Second, “Android TV box” may be used for both operator middleware and white-label products. Third, codec capability can be quoted without the complete service chain: application, platform decoder, DRM, display output, television and content source. Fourth, accessory lists may include a remote, adapter or adapter-based Ethernet that changes the deployment topology. Fifth, regional certification and radio configurations may differ even when the commercial description looks identical.
A specific example is a hotel group that specifies Wi-Fi6 and assumes the room controller will use Ethernet. If the quotation confirms only the radio generation, the installation team may discover after PO that RJ45 is 100M, or that the chosen SKU has no Ethernet in the approved configuration. The corrective action can be a different SKU, an accessory change, revised installation instructions or a network-design decision. Which action applies depends on what the frozen RFQ actually says.
Another example is a streaming trial based on a 4K codec label. The application may request a profile, refresh rate or output mode that the submitted hardware does not support under its operating system, rights build or HDMI path. A quotation that says “4K capable” has not defined whether the requirement concerns decoding, output, both, or a particular display mode. Define those terms before sample approval.
Commercial control: the purchase order should identify the approved model, exact production configuration, OS branch, radio configuration, port map, firmware baseline, target-market compliance scope, accepted sample and required inspection evidence. “Latest version” is not a valid baseline; a dated build identifier or controlled release designation is needed.
The remediation cost rises with stage. A missing Ethernet requirement can be corrected before tooling by selecting the correct configuration. After pilot sign-off, it may require changing hardware, modifying installation instructions or replacing affected units. A codec misunderstanding can invalidate the application profile; a DRM mismatch can stop the commercial service. For this android tv box checklist, the commercial impact should be stated as a risk category rather than an unsupported numerical claim.
Add a deviation form to the order file. It should identify the affected SKU, the changed component or software item, the reason for change, the affected requirement, the regression result, the new evidence package and the approving parties. A substitution without that record breaks lot traceability and leaves the operator unable to determine which behavior was validated.
How the factory controls the variable
A factory’s role is to turn the approved specification into repeatable evidence. DataMax can describe an OEM/ODM control process, but the buyer must verify the evidence for the exact production lot. A datasheet establishes intent; the inspection record establishes conformity.
- Incoming-material control Match module, cable, connector and accessory identities to the approved BOM and purchase order. Check component revisions and approved substitutions before they enter the line.
- SMT and AOI verification Review stencil, placement, solder-joint, polarity and inspection results for the populated PCB. Retain the inspection report against the board or lot identifier.
- Boot and functional verification Record operating-system boot, display output, USB enumeration, TF detection, Ethernet link, S/PDIF or AV function, audio path, wireless connection and required peripherals.
- Aging and stress testing Apply the agreed thermal, power and reboot sequence. The duration and sample quantity must be written in the inspection instruction rather than implied by the word “aging.”
- Dark-room and radio verification Review display output, black-level appearance, leakage and the declared Wi-Fi/Bluetooth configuration under the defined test conditions. Relate the result to the production configuration and applicable target-market scope.
- Audit trail and release Link inspection, functional, aging, packaging and shipment records to the production lot. Close deviations through written approval before release.
The buyer should request evidence tied to the topology being ordered, not a generic facility tour. DataMax factory quality is the appropriate starting point for an audit request, with the ask narrowed to SMT/AOI records, aging records, dark-room records and configuration traceability for the candidate SKU.
A production datasheet remains essential because the listed models differ in OS, processor, RAM/ROM options and I/O. The factory cannot create compliance by inspection alone: if the commercial requirement calls for an Android release, port, DRM mode or Ethernet variant not present in the approved model configuration, the correction begins in the BOM or order specification.
For a purchasing team, the evidence index should contain the approved golden sample, golden-sample report, factory process flow, SMT/AOI summary, functional-test limits, aging instruction and result, dark-room instruction and result, target-market certificate scope, packaging list and serial/lot linkage. DataMax can supply the relevant records for review through the manufacturer route, but acceptance criteria must be agreed before the pilot.
The evidence index should also record the configuration variables that alter the test method. An Ethernet speed choice, USB version, radio module and rights build are not interchangeable test conditions. The report should identify the production-line fixture or script used for each interface, its pass criterion, the units tested and the deviation disposition. Without those links, a report can show that some device passed a generic inspection without proving that the ordered device was inspected.
For a mixed deployment, define the sample plan before the pilot. A golden sample establishes the intended reference configuration; a pilot batch checks repeatability across units; a pre-shipment sample may then verify packaging and lot linkage. The acceptance matrix should identify which tests apply to every unit, which are sampled, which are destructive and which require the customer’s middleware, DRM service or display equipment. Customer-only tests need a named date, environment and signatory so they do not become unowned actions.
Two routes, one bill of differences
The practical choice is not simply “low tier versus high tier.” It is an entry configuration with fewer commitments versus a commitment configuration with more controlled variants, evidence and service obligations. The selected DataMax model should follow the workload.
| Decision dimension | Entry route | Commitment route |
|---|---|---|
| Hardware basis | Use the closest published fit without assuming unavailable options | Freeze an exact approved SKU and production BOM |
| Connectivity | Confirm each connector, Ethernet variant and radio configuration | Run the complete endpoint schedule on the golden sample and pilot batch |
| Software | State Android release, firmware baseline and service responsibilities | Control middleware, DRM, update policy and regression evidence |
| Certification | Confirm target-market scope for the ordered configuration | Attach certificate scope and configuration evidence to the release file |
| Inspection | Receive representative functional and packaging records | Link SMT/AOI, aging, dark-room and functional records to the lot |
| Change control | Inform the buyer before component substitution | Require written reapproval for hardware, firmware, radio or rights changes |
The following editorial ranking shows why a golden sample and pilot sign-off change the review burden. It is a qualitative planning scale, not audited or measured data.

The same figures, in searchable form:
| Stage | Editorial score (/100) |
|---|---|
| Requirements only | 25 |
| Requirements plus target price | 46 |
| Approved golden sample | 74 |
| Pilot batch sign-off | 91 |
The entry route can be appropriate for a controlled pilot where the buyer accepts configuration discovery during validation. Its weakness is late discovery of port, OS or service mismatches. The commitment route costs more coordination before release, but it reduces the likelihood that a mass-production configuration diverges from the evaluated sample.
For each route, list what is actually commercial: unit configuration, tooling, certification scope, middleware integration, test fixtures, pilot samples, packaging and any third-party software obligations. Do not use unsupported comparative prices or generic claims of value. The android tv box checklist should distinguish quoted hardware from engineering work and evidence generation. A lower-cost SKU can create a higher total engineering burden if its port map, OS baseline or rights configuration does not match the application.
A practical entry-route quotation should still identify the model, memory and storage option, OS release, standard and optional ports, DRM position, compliance scope and sample fee or sample availability without inventing commercial terms. The commitment route adds a signed port map, a golden-sample identifier, a firmware baseline, a rights checklist, test limits, deviation rules and lot-linked inspection evidence.
The difference between the routes can be illustrated without introducing a new model. For a DM21P brief, the entry route might state the published operator-set-top-box fit and ask the supplier to confirm the selected memory, storage, Ethernet, Wi-Fi and DRM configuration. The commitment route names the exact selected variant, tests HDMI 2.0b out x1, USB2.0 x2, TF, S/PDIF, 3.5mm AV, RJ45 100M and the specified radio configuration, then records the result against the golden sample. The second route consumes more review time before release because its evidence must remain valid through production.
How the requirement actually works
An android tv box checklist is most reliable when each item names an observable interface and its acceptance condition. A port list is not a connectivity architecture. The architecture includes the physical endpoint, electrical standard, negotiated mode, software driver, application path, network service and test method.
HDMI output carries video and audio toward a display. HDMI 2.0b identifies a specification level, but the accepted operating mode still depends on the source content, software path, display and EDID handling. All four DataMax models specify HDMI 2.0b output. The DM21T explicitly has no HDMI input, so any source arrangement requiring capture or pass-through must be handled by another device or a separately approved platform.
USB similarly requires version and role separation. The DM21T lists USB2.0 x1 and USB3.0 x1. The DM21P and DM21S each list USB2.0 x2; the DM22Q also lists USB2.0 x2. The checklist must define whether a port is for storage, input, tethering or service recovery. USB3.0 on the DM21T may justify a different peripheral or workload assumption from a USB2.0-only configuration, but it does not prove a particular external-drive performance level.
RJ45 must be resolved as a fixed or optional configuration. The DM21T, DM21P and DM21S list RJ45 100M, with 1G optional where stated. The DM22Q lists RJ45 100M with 1G opt. These are factory options where the facts state them, but the selected SKU still needs to be checked against the production datasheet. Ethernet suitability for an operator therefore depends on the confirmed speed, switch, DHCP or static configuration, multicast or IPTV service requirements, and remote-management policy.
Radio requirements combine several layers. Wi-Fi6 and Bluetooth 5.4 describe the listed radio generation, while “2x2” appears for the DM21P, DM21S and DM22Q configurations. The DM21T facts list Wi-Fi6 + BT5.4 without adding a 2x2 designation. Do not import that attribute from another row. Module selection, antennas, enclosure, regulatory domain and certification evidence complete the actual configuration.
DRM and protected-output behavior require an end-to-end policy. Widevine L1 is listed across the four models. PlayReady is optional for DM21T, DM21S and DM22Q, while DM21P lists PlayReady as optional. HDCP 2.2 is optional for DM21P. Dolby Vision and DTS appear for DM21S and DM22Q. These entries define choices to confirm, not blanket statements that every unit includes every service. Confirm the ordered build against the production datasheet.
The network acceptance sequence should distinguish physical connectivity from service delivery. First, verify the link at the declared RJ45 speed or through the selected Wi-Fi6 module. Second, verify address acquisition, DNS resolution and loss of network recovery. Third, exercise the operator’s required transport, including multicast, VPN or remote-management behavior where applicable. Fourth, run the application against the protected-content path. This separates a successful network association from a successful commercial service.
The audio path requires the same discipline. S/PDIF, 3.5mm AV and HDMI output are different physical paths with different device requirements. The RFQ should name the intended receiver, sample rate, channel arrangement and test source where known. The acceptance record should identify the connector used and the observed result, rather than stating that “audio works” without a path.
A protected-content test also needs a controlled source and display. The service account, requested stream, output mode and rights level should be recorded. If the same SKU supports different optional rights configurations, the result applies only to the build that produced it. That is why the firmware, rights and hardware identifiers belong beside the port map in the approval file.
The platform shortlist with datasheet values
This shortlist uses only the supplied production facts. Options marked optional must be named in the order configuration, not treated as standard content.
| Model | Compute and OS | Memory | DRM | Ports and connectivity |
|---|---|---|---|---|
| DM21T | Amlogic S905X5, quad Cortex-A510 (ARMv9); AOSP Android 14 | 4GB / 64GB family options | Widevine L1 / PlayReady optional | HDMI 2.0b out, no HDMI in; USB2.0 x1 + USB3.0 x1; TF; S/PDIF; AV; RJ45 100M, 1G opt; Wi-Fi6 + BT5.4 |
| DM21P | Amlogic S905Y4, quad Cortex-A35; AOSP Android 11 | 2GB / 8GB; 4GB; 16/32/64GB optional | Widevine L1 / PlayReady / HDCP 2.2 optional | HDMI 2.0b out x1; USB2.0 x2; TF; S/PDIF; 3.5mm AV; RJ45 100M; Wi-Fi6 2x2 + BT5.4; DC 5V/2A |
| DM21S | Amlogic S905Y5, quad Cortex-A55; AOSP Android 14 | 2GB / 16GB; 2/4/8GB; 16/32/64GB optional | Widevine L1 / PlayReady optional; Dolby Vision/DTS | HDMI 2.0b out; S/PDIF; AV; USB2.0 x2; TF; RJ45 100M, 1G optional; Wi-Fi6 2x2 + BT5.4 |
| DM22Q | Amlogic S905X5M, quad Cortex-A55 up to 2.5GHz; AOSP Android 14 | 4GB / 64GB; 2/4/8GB; 16/32/64GB optional | Widevine L1 / PlayReady optional; Dolby Vision/DTS | HDMI 2.0b out; USB2.0 x2; TF; S/PDIF; AV; RJ45 100M, 1G opt; Wi-Fi6 2x2 + BT5.4 |
The DM21T is the direction for a premium UHD or cloud-gaming brief when its USB3.0 provision and stated decode set are required. Its listed decoders are H.266/VVC [email protected] 4K@120, AV1/VP9/H.265 4K@120, AVS3 4K@120 and H.264 4K@60, with inline AI-SR. The DM21P is directed toward a 4K IPTV or operator middleware set-top box, with AV1 [email protected], VP9/H.265 4K@60 and H.264 4K@30. The DM21S targets a 4K Android TV box for IPTV/OTT white-label use, with AV1 and H.265 [email protected] 4K@60. The DM22Q is gaming-oriented, with AV1/H.265 L5.1 4K@60 and inline AI-SR.
Do not convert any listed decode or output figure into an 8K claim. The current datasheet ceiling is 4K, and the exact output mode must be validated. For a purchasing package, request the final model matrix and sample review, then attach the signed I/O schedule, firmware and DRM checklist, target-market certification scope, and lot-linked SMT/AOI, aging and dark-room evidence. Email [email protected] with those five items before releasing the PO.
The table also prevents a category-led substitution. DM21T and DM22Q both use AOSP Android 14 and list 4GB / 64GB among their memory options, but their stated processors, decode sets and USB arrangements differ. DM21P and DM21S both fit IPTV-oriented briefs, yet their Android releases, processors, memory families and port lists differ. Select against the signed requirement, then confirm the selected SKU rather than treating two rows as interchangeable.
For the closing review package, request five attachments: the final SKU list, the signed I/O and port map, the middleware/DRM checklist, the target-market certification scope and the required factory evidence index. DataMax can support a video factory audit and provide the relevant production records, while the purchasing team confirms them against the production datasheet and approved sample.
Further reading
- RK3568 Android Box Checklist for Procurement Teams
- Compliance support by market
- About DataMax
- RFQ checklist for device procurement
- Procurement glossary
- DataMax DM21T specifications and fit
- DataMax DM21P specifications and fit
FAQ
Does Wi-Fi 6 eliminate the need for Ethernet in an operator deployment?
No. Wi-Fi 6 describes the listed radio generation, but an operator may require wired DHCP, multicast, remote management or predictable service behavior. Specify the RJ45 speed and selected configuration, then test it against the actual network. Wi-Fi 6 can remain the wireless fallback rather than the primary acceptance path.
Is every listed DRM service included in every order?
No. The product facts identify combinations and optional items differently across models. Widevine L1 is listed across the range, while PlayReady, HDCP 2.2, Dolby Vision and DTS must be checked for the selected model and ordered build. Name each required service in the RFQ and verify it on the golden sample.
How many USB ports should the RFQ state?
State both count and version, then assign a purpose to every port. The DM21T lists USB2.0 x1 and USB3.0 x1, while the DM21P, DM21S and DM22Q list USB2.0 x2. If storage, service recovery or an external peripheral is operationally required, identify its expected role and test procedure.
Can a “4K” decoder claim guarantee 4K at the television?
No. Decode capability, output capability, DRM, application behavior, source material and television support form separate conditions. The android tv box checklist should require the declared mode, refresh rate and profile to be tested on the target display, including an approved golden sample and pilot evidence.
What should be approved before mass production?
Approve the exact SKU, port map, OS and firmware baseline, rights configuration, target-market compliance scope, golden sample, test limits and report format. The android tv box checklist becomes enforceable only when each requirement has an owner, an artifact and a disposition rule for deviations.
How can a buyer obtain topic-specific factory evidence?
Ask DataMax for a video factory audit and request SMT/AOI, aging, dark-room and configuration-traceability records tied to the candidate production configuration. Use the inquiry page and specify the SKU, target market, middleware/DRM checklist and required evidence before the review.